After opening

Commercial Office Block

Description

Challenge: 

Any asset, especially a new build requires protection from vehicle damage. This contractor had a tight project timeframe to meet and was relying on a proven supplier to be ready to go as soon as the carpark was ready. 

Solution:

Vanguard reserved stock of Recycled Rubber Wheel Stops for the client, delivered to site as soon as the carpark was ready, and installed in a timely fashion, meaning the project handover took place smoothly. 

Talk to us
Magnify
NZ Owned and Operated
© Copyright 2019 Vanguard | Site Map | Site by Mondo | 0800 500 147 | sales@vanguardgroup.co.nz | Terms & Conditions