After opening

CBD Cycleway

Description

Challenge:

Creating cycleways in downtown Auckland is not for the fainthearted. Our client required a solution that created a physical buffer between cyclists and vehicles, however vehicles still needed to drive over the cycleway into a busy wharf area. 

Solution: 

By using Vanguard's 50mm High Interlocking Speed Hump, this created a physical and visual buffer, but still allowed vehicles to pass over as required. 

Talk to us
Magnify
NZ Owned and Operated
© Copyright 2019 Vanguard | Site Map | Site by Mondo | 0800 500 147 | info@vanguardgroup.co.nz | Terms & Conditions